Raw water lines. Cooling lines. Chemical waste lines. Storm water draining lines. Fire protection lines. ISCO has the High Density Polyethylene (HDPE) pipe to meet all of these needs, including above-ground, underground and FM-approved firewater applications. The combination of cost-competitive materials, speed of installation, time-proven system integrity and corrosion resistance have made HDPE pipe the material of choice for refineries, petrochemical plants, LNG projects, paper and pulp mills, as well as nuclear, natural gas, and coal-fired power plants. ISCO’s expertise in navigating the labyrinth of specification and quality requirements, as well as providing the equipment, training and on-site testing you need are the reason ISCO is the supplier and fabricator of choice. It’s a total package that has made ISCO a world leader in fluid collection and transportation.

A successful project of firsts including the first implementation of the newly developed ASME Code Case N-755, the first installation of HDPE in an ASME Class 3 system, and the first NRC relief request approval for the use of an HDPE piping system. This provides a cost saving, long-term and safe option for other nuclear facilities around the country with degrading infrastructure. From training to final testing, the actual installation process took just 12 months with no disruption in service for the 780,000 households using electricity generated by the Calloway plant.